Reminder - Lake Lure Will Begin Refilling On 3/31/23
The 2023 Lake Lure drawdown began 1/1/23 as planned in support of several important infrastructure projects. It is anticipated that the lake will begin refilling on 3/31/23. The rate of refilling the lake is dependent upon weather conditions but information will be posted here regarding weekly lake levels.
A list of projects that have been underway during the lake drawdown is listed below:
- Beginning of Phase One of the sewer system replacement project. This will include boring pipe sleeves on properties in the Sunset Cove area.
- Lake dredging with excavators
- Seawall repair/replacement
- Penstock inspection and warranty repairs
- Work on deep water access ramp near the dam
NOTE: Contractors working on seawall repairs/replacement should be out of the lake at this time.